Valve, flange installation should be how to implement quotas

According to the national unified fixed quantity calculation rules: (1) valve, flange installation, production and installation of a variety of casing, pump room pipeline installation and pipeline system strength test, tight test implementation of Volume VI, "Industrial Pipe Installation Project" project. (2) fire hydrant pipes, outdoor water supply pipe installation and production and installation of water tanks, the implementation of the eighth book "to the drainage, heating, gas installation project> the corresponding project. (3) Installation and secondary grouting of various fire pumps, stabilizing pumps, etc., and implementation of the first page of the corresponding page of "Machinery and Equipment Installation Project". (4) Installation of various instruments, valves with telecommunication signals, flow indicators, wiring of pressure switches and school lines, and implementation of the tenth item of "Automatic Control Instrument Installation Project". (5) The production and installation of various equipment supports, etc., the implementation of the fifth book "static equipment and metal structure manufacturing installation project" corresponding project. (6) pipe, equipment, brackets, flange weld rust brush oil, the implementation of the eleventh "brush oil, anti-corrosion, thermal insulation project," the corresponding project. (7) the system debugs the seventh chapter fifth chapter corresponding item. Implementation of the eleventh "brush oil, anti-corrosion, thermal insulation project"